About Hamdi Eldeeb

Education

Experience

  • 2015 - Present
    Siemens

    Senior Project Manager

    Review contracts , negotiated revisions, changes and additions to contractual From Position Company negotiation. : Feb, 2011 till Oct : Project Manager : Siemens –Saudi Arabia. (Energy Management –CS) agreements with clients.  Manage high profile cleints ans assits them with technical issue.  Provide Pre-sales tech for high/meduim voltage products.  Generate and research list of potential target customers, focusing on the top revenue derives.  Demonstrate the product to prospects ,tailored to the company’s need  Attending technical meetings with the client and subcontractors  Review and manage the customers inquiry and process it into acosted workable solution.  Attend resultant call for negotation with the customer and convert those opportunities into purshase order.  Service mangment and technical support.  Represented the company on matters

  • 2011 - 2015
    Siemens

    Electrical Project Manager

     Directed the exeuction of manufacutring solution development from conception through prodcution till execution the site.  Provided superior customer care , analyzed processes.  Developed project plan , coorinated resourcse , supervised projected teams  Controlled budgets and managed performance.  Lead highly effectiveproject implementation teams.

  • 2008 - 2010
    AMCDE-KBR

    Electrical project Engineer

    Carried out necessary electrical calculation such as cable sizing, lighting system From Position Company (by dialux), electrical transient analysis study (by ETAP).  Designed MV/LV system, fire alarm system, cathodic protection, Cable tray, lighting system.  Prepared procurement specifications for electrical materials and equipment such as power cables, control board panels, high & low tension switchgear, transformer and wiring for major projects

  • 2008 - 2010
    AMCDE-KBR

    Electrical project Engineer

    Carried out necessary electrical calculation such as cable sizing, lighting system From Position Company (by dialux), electrical transient analysis study (by ETAP).  Designed MV/LV system, fire alarm system, cathodic protection, Cable tray, lighting system.  Prepared procurement specifications for electrical materials and equipment such as power cables, control board panels, high & low tension switchgear, transformer and wiring for major projects

  • 2004 - 2010
    MRK

    Electrical Engineer

     Studied, reviewed design package and papered remark drawings with respect to Saudi Aramco Standards and site condition.  Prepared RFQ for martial with respect to Aramco standard requirement.  Prepared technical queries, red line drawings, and proposal for any modification and as built drawings.  Prepared material take-off and procurement of E&I material and equipment.  Coordinate and acquire construction approval for each equipment from client and QA/QC inspectors  Coordinated site acceptance test (SAT) and commissioning.  Prepared daily, weekly and monthly construction schedule and progress report