About Hamdi Eldeeb
Education
-
2004
Monofia University
BSC of Electrical Engineering
Experience
-
2015 - Present
Siemens
Senior Project Manager
Review contracts , negotiated revisions, changes and additions to contractual From Position Company negotiation. : Feb, 2011 till Oct : Project Manager : Siemens –Saudi Arabia. (Energy Management –CS) agreements with clients.  Manage high profile cleints ans assits them with technical issue.  Provide Pre-sales tech for high/meduim voltage products.  Generate and research list of potential target customers, focusing on the top revenue derives.  Demonstrate the product to prospects ,tailored to the company’s need  Attending technical meetings with the client and subcontractors  Review and manage the customers inquiry and process it into acosted workable solution.  Attend resultant call for negotation with the customer and convert those opportunities into purshase order.  Service mangment and technical support.  Represented the company on matters
-
2011 - 2015
Siemens
Electrical Project Manager
ï‚· Directed the exeuction of manufacutring solution development from conception through prodcution till execution the site. ï‚· Provided superior customer care , analyzed processes. ï‚· Developed project plan , coorinated resourcse , supervised projected teams ï‚· Controlled budgets and managed performance. ï‚· Lead highly effectiveproject implementation teams.
-
2008 - 2010
AMCDE-KBR
Electrical project Engineer
Carried out necessary electrical calculation such as cable sizing, lighting system From Position Company (by dialux), electrical transient analysis study (by ETAP). ï‚· Designed MV/LV system, fire alarm system, cathodic protection, Cable tray, lighting system. ï‚· Prepared procurement specifications for electrical materials and equipment such as power cables, control board panels, high & low tension switchgear, transformer and wiring for major projects
-
2008 - 2010
AMCDE-KBR
Electrical project Engineer
Carried out necessary electrical calculation such as cable sizing, lighting system From Position Company (by dialux), electrical transient analysis study (by ETAP). ï‚· Designed MV/LV system, fire alarm system, cathodic protection, Cable tray, lighting system. ï‚· Prepared procurement specifications for electrical materials and equipment such as power cables, control board panels, high & low tension switchgear, transformer and wiring for major projects
-
2004 - 2010
MRK
Electrical Engineer
ï‚· Studied, reviewed design package and papered remark drawings with respect to Saudi Aramco Standards and site condition. ï‚· Prepared RFQ for martial with respect to Aramco standard requirement. ï‚· Prepared technical queries, red line drawings, and proposal for any modification and as built drawings. ï‚· Prepared material take-off and procurement of E&I material and equipment. ï‚· Coordinate and acquire construction approval for each equipment from client and QA/QC inspectors ï‚· Coordinated site acceptance test (SAT) and commissioning. ï‚· Prepared daily, weekly and monthly construction schedule and progress report